ADTO GROUP High Quality Waterproof Easy Handling PVC Plastic Formwork For Concrete Construction System Suppliers

FOB Reference Price:Get Latest Price
US $60-70 / Square Meters | 1 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hunan, China (Mainland)
Brand Name:
ADTO
Model Number:
ADTO
materials:
enhance ABC,PVC,Plastic,waterproof
working loading capacity:
60kN/ Sqm
Application:
Plastic concrete formwork for wall, piller,column
colour:
black
Reusable time:
Over 100 times
Weihgt:
15KG/Square Meter
Life span:
Over 10 years
Thermal deformation temperature:
Above 150 degree Celsius
Assemble and Disassemble:
Easy and Quick
Eco-friendly:
OK
Packaging & Delivery
Packaging Details
loading in full container
Port
China Main port
Lead Time :
30 days after receiving deposit

ADTO GROUP High Quality Waterproof Easy Handling PVC Plastic Formwork For Concrete Construction System Suppliers

Product Description

1.Adjustable

 

2.Featre

      Efficient :faster assembling,our formwork can be pre-assembled in the factory and be combined quickly on the building site, Manual easy handling, also due to the whole system by using the connecting key, simply rotate the connecting key 90 degrees can be installed quickly removed, without the need for skilled men, as long as the ordinary of the work force can be operated. Therefore, it can improve the construction efficiency and reduce labor costs.

 

 

3. Saving  labor and material

      Due to the excellent performance of the material, under normal circumstances can reuse of 80-100 times, thereby significantly reducing the cost of single use, at the same time, has many times reuse can effectively and avoid the template repeatedly procurement and transportation to bring additional time and cost, but also accelerate the construction progress.Template using modular assembly, handle connection, reducing the overall nails,wire, wood, flute and so on auxiliary use cost, and wood processing, equipment leasing costs.

 

 

4. Flexible construction

Flexible combination. Template specifications, flexible combination, for a large area of shear wall, the whole

hoisting crane, can also be manually assembled.

Cylindrical die size. For column mode, the design of the three different types, each model to 100mm as modulus, can be adjusted arbitrarily according to the size of column, basic coverage column die size required, and all column form innovation design of pulling out of hole, the die pillar reinforcement than traditional template reinforcement more simple.
Convenient pouring. On the wall, in one column, pouring, can also be a separate column, wall, floor slab casting.

 

 

5. Safety and environmental protection

The use of composite,reduce the discharge of construction garbage, at the same time, the template is damaged, to repair the hole; after the abolition of the template, recycling utilization, increases the mould of the residual value, thereby reducing the environmental pollution and reduce the negative impact on the environment.

 

6.Related products

 

 

 

 

On trade  fair :

 

 

Packaging & Shipping

 

 

 

Certification:

 

Our Services

 

  We are adhere “simple is best, common is best”

*We will offer technical guide.

*We will offer project design plan according your drawing.

*We will offer assemble video.

*We will offer after-sale service.

 

 

FAQ

 

1. Q: What's your MOQ(minimum order quantity)?

    A: One full container.Or if you are very interest in our products,and want to try to develop your market,several sets is ok.

2. Q: What's your packing methods?

    A: Packed into bundle, and rest in bulk.

3. Q: What's your payment terms?

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

4. Q: What's your delivery time?

    A:25-30 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?

    A: We are the munafacturer of scaffolding&formwork for decade years. Our group company  has 8 subsidiaries and 4 factories, coveraged every scaffolding and formwork  systems.

6. Q: Where's your factory?

    A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, Jiangsu province afforded enough production ability and earlier delivery time.

7. Q: Could  we visit your factory?

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

Company Information

 

*Established in 1998,with more than decades of years experience on scaffolding&formwork.

*Year sales volume:3.0 billion us dollars.

*Partener:Products export to over 50 countries.